Here are some pictures that I took tonight.
Looking down the first part of the hallway. On the left is the gym and on the right is a small utility area
The larger part of the basement (rec room). The walls will run down the left side, and then go back to where that 2x4 is laying on the floor. It's about 800 square feet that will be added on.
Door way at the bottom of the stairs and smaller doorway to small utility area (houses water softner and reverse osmosis system).
The larger part of the basement (rec room). The walls will run down the left side, and then go back to where that 2x4 is laying on the floor. It's about 800 square feet that will be added on.
Door way at the bottom of the stairs and smaller doorway to small utility area (houses water softner and reverse osmosis system).
The remainder of the studding will be completed next week. Then I get to start running the wiring for the electrical. Now that's going to be fun!
3 comments:
Okay, Step one of many, is there a lumber shortage? Why hasn't the work continued? To bust playing PS2 no doubt....
Not really a lumber shortage, just the "shortage" of the vehicles. Ron's van is the only one big enough to carry studs in. That sounded bad.
Still need to get a permit as well ;-)
That sounded really bad, sounds like you're driving round Winnipeg filming gay porn....
You likely would need a permit for that as well.
Post a Comment